After Handover: A Building Begins When the Architect Loses Control
The first months after handover are a building’s live calibration period. A return ledger and warranty map can turn occupation into professional knowledge.

The first months after handover are a building’s live calibration period. A return ledger and warranty map can turn occupation into professional knowledge.

A visual note on the 3D model as a building’s first rehearsal, revealing movement and mistakes before they become construction costs.

For World Architecture Day 2026, INJ reframes adequate housing through usable space, changing generations, affordability and dignity.